The plumbing was tied into the existing lines today. The lines were put in the floor in the basement and as a result, we have a big pile of dirt in the middle of the room that they had to dig out. I won't be surprised if we find a few rawhides that Bea burried in there. I'm hoping the plumbing inspection is tomorrow so that they can fill it back in and pour the concrete. They ran the lines up through the old master bedroom closet to get to the upstairs. This will eventually be a pantry, so we can box it in without any issue.
The hot and cold water supply lines were put in today as well as a ton of duct work in both the downstairs and upstairs. Looks like they're shooting for an inspection tomorrow.