This morning, Brian had oiled the countertops before I had even gotten out of bed. The veining in them really stands out now. They look really cool. I'm glad Brian decided to go with the soapstone on both sides. It was the right decision.
When I came back from work, he had primed one of the walls and the pantry. Then before we went to bed, we primed the other wall and the dining room wall. The last thing that happened today was elecrical work. From the picture below you can see light switches and the canned lighting trim was installed today. There are still a few things left for the electrical guy to do, but we are close in that regard. There is a possibility the flooring guy will be here tomorrow to do the wood floors. If we can, we will prime and paint the remainder tomorrow.
No comments:
Post a Comment